Air Freight News

Livo Logistics manages shipment of construction equipment

Apr 22, 2021

Livo Logistics have managed a complex multimodal shipment of pipeline construction equipment consisting of a total of 82 machines.

The machines and equipment was moved from Belokopitovo in Bulgaria via the port of Varna to Dammam, Saudi Arabia. Out of the 82 machines, the biggest were a Superior Padding machine measuring 1320 x 420 x 450cm (54tn) and a Vietz Bending machine at 965 x 410 x 415cm (73tn).

The shipment totalled over 2,500cbm / 1,300tn of oversized and heavy cargo plus 9 of the shipper's owned containers.


.

Similar Stories

https://www.ajot.com/images/uploads/article/Navigators-Shipping-and-Logistica%2C-the-Worldwide-Project-Consortium_truck-movement.jpg
Navigators move project shipments from the Middle East to Asia
View Article
https://www.ajot.com/images/uploads/article/Jim-Lange_UTC.jpg
Jim Lange is promoted to Vice President, Special Projects at UTC
View Article
https://www.ajot.com/images/uploads/article/BBC-Chartering-LakerMax-vessels-at-Duluth-SM.jpg
BBC Chartering LakerMax vessels mark back-to-back milestones at Port of Duluth-Superior
View Article
https://www.ajot.com/images/uploads/article/CMT_testing.jpg
Fleet-wide roll out for CMT fuel and lube test kits increase as ship managers look to reduce costs
View Article
https://www.ajot.com/images/uploads/article/AAL_wind_turbine_blades.png
AAL reduces sailings and boost efficiency for King Rocks Wind Farm
View Article
https://www.ajot.com/images/uploads/article/Ocean_Infinity_operations_centeer.jpg
Offshore operations: Why small improvements no longer cut it?
View Article