Air Freight News

BATI load 1,000tn of project cargo

Feb 09, 2021

In late 2020, the project team at BATI Shipping & Trading in Turkey successfully performed an important operation. Around 1,000tn (14,800cbm) of project cargo, as well as some containers, consisting of pipe rack modules, spreader beams and lifting equipment was loaded on MV. Sophia with the destination of Itaqui Port, Brazil.

BATI managed the pre-loading and loading survey for the cargo including the oversized pipe racks and structures with 19m lengths and 7m widths.


Similar Stories

https://www.ajot.com/images/uploads/article/Ocean_Infinity_operations_centeer.jpg
Offshore operations: Why small improvements no longer cut it?
View Article
https://www.ajot.com/images/uploads/article/AAL_Brisbane_BESS_Cargo_A-Class%2C_AAL_Brisbane_loading_BESS_Cargo_in_Taicang.jpg
AAL Shipping claims 2026 AFLAS Project Cargo Award
View Article
https://www.ajot.com/images/uploads/article/TM3x.png
Total Movements manages heavy-lift gas processing units for Middle East gas production project
View Article
https://www.ajot.com/images/uploads/article/JSI_-_Dahej_berth_expansion-Jumbo_Javelin_%285%29.jpg
JSI Alliance delivers safe and efficient heavy-lift installation for Dahej berth expansion
View Article
https://www.ajot.com/images/uploads/article/790-Sander-Van-De-Meer.jpg
Logistics players adapting to Europe automotive industry’s shift in dynamics
View Article
https://www.ajot.com/images/uploads/article/monopile.jpg
Two monopile handling innovations boost Baltic Power offshore wind farm
View Article