Air Freight News

Athena Global Logistics report huge breakbulk project

Feb 29, 2024

Athena Global Logistics recently handled a huge breakbulk project for a power plant with cargo moved from India to the UAE.

The cargo of power plant machinery and parts in a dismantled condition originated in Gujarat before transport to the POL of Mumbai for shipping to Jebel Ali, UAE. The gross weight of the shipment totalled 440mtn with 126 pieces.

  • 2 x Main Generators - Each at 136mtn
  • 116 x Spare Parts (including compressors, panels, filters, pipes, etc.) - 73mtn
  • 7 x 40'HC Containers with Spares & Accessories - 80mtn
  • 1 x 40'OT Container with Spares & Accessories - 15mtn

Athena were responsible for an extensive scope of work including registration, pre-inspection, planning, carting, transportation, fumigation, examination, measurements, painting, labelling, port handling, under-hook movement, valuation, customs, packing, surveys, freight handling and shipping.

Similar Stories

https://www.ajot.com/images/uploads/article/Navigators-Shipping-and-Logistica%2C-the-Worldwide-Project-Consortium_truck-movement.jpg
Navigators move project shipments from the Middle East to Asia
View Article
https://www.ajot.com/images/uploads/article/Jim-Lange_UTC.jpg
Jim Lange is promoted to Vice President, Special Projects at UTC
View Article
https://www.ajot.com/images/uploads/article/BBC-Chartering-LakerMax-vessels-at-Duluth-SM.jpg
BBC Chartering LakerMax vessels mark back-to-back milestones at Port of Duluth-Superior
View Article
https://www.ajot.com/images/uploads/article/CMT_testing.jpg
Fleet-wide roll out for CMT fuel and lube test kits increase as ship managers look to reduce costs
View Article
https://www.ajot.com/images/uploads/article/AAL_wind_turbine_blades.png
AAL reduces sailings and boost efficiency for King Rocks Wind Farm
View Article
https://www.ajot.com/images/uploads/article/Ocean_Infinity_operations_centeer.jpg
Offshore operations: Why small improvements no longer cut it?
View Article