Air Freight News

Trailer Bridge supports infrastructure investment in Puerto Rico

Dec 09, 2021

Trailer Bridge welcomed Puerto Rican Governor, Pedro R. Pierluisi, Puerto Rico Electric Power Authority Executive Director Josue Colon, and Mr. Joel Piza, Executive Director of Puerto Rico Ports Authority to its Army Terminal this week for a press conference celebrating the arrival of a significant rotor component that will support the island’s electrical grid.

The turbine rotor arrived in San Juan aboard a Trailer Bridge barge and will be utilized to power Unit 6 turbine at the Costar Sur Power Plant, adding approximately 410mv to the electrical system. At the event, Pierluisi said, “We remain committed to transforming our entire electrical system in order to have a generation based on renewable energy and guarantee that we can provide energy to our people, and to our productive sector on the Island, in a reliable way with a modern and resilient system.”

Today’s event highlights the importance of Trailer Bridge’s barge service to the island which accommodates the efficient movement of oversized project cargo. The company’s roll-on, roll-off barges, the only consistent weekly service in the trade and largest in the world, are necessary to support the rebuilding efforts happening now as well as infrastructure improvements of the future.

“The foundation of our business began by serving the people of Puerto Rico and this milestone in a project to provide renewable energy on the island is one worth celebrating,” said Trailer Bridge CEO and President, Mitch Luciano. “We are proud to be a critical piece of the supply chain that delivers the goods our neighbors on the island need and we look forward to serving for many years to come.”

In early 2021 Trailer Bridge signed its first 20-year lease agreement with the Puerto Rico Ports Authority, solidifying the strong relationship and continued support of shipper’s needs to and from the island. Trailer Bridge has been serving Puerto Rico for more than 30-years with reliable service, creating jobs and providing economic opportunity for our neighbors.

Trailer Bridge’s long-standing partner Anderson Trucking Service (ATS) was vital in making this happen as they were responsible for the over-the-road transport of the component from its U.S. origin location to Trailer Bridge’s Jacksonville terminal as well as from the port in PR to its final destination.

Similar Stories

https://www.ajot.com/images/uploads/article/POLB_Signingjpg.jpg
DOT and Port of Long Beach sign agreement to test nuclear-powered vessels
View Article
https://www.ajot.com/images/uploads/article/Sjoerd-De-Jager-Managing-Director-of-PortXchange_2.jpg
PortXchange joins the Port of San Diego’s Blue Economy Incubator
View Article
https://www.ajot.com/images/uploads/article/Inside_a_car_carrier.jpg
MOL develop and introduce the ‘Skater’ to streamline cargo handling on car carriers
View Article
https://www.ajot.com/images/uploads/article/Kelsey_Foster_Press_Release.jpg
We Work the Waterways expands leadership team with appointment of Foster as Deputy Director
View Article
CMA CGM PSS - from the Mediterranean to the Middle East and Red Sea (OOG cargo)

CMA CGM Peak Season Surcharge (PSS) rates applicable as from August 1st, 2026 (date of loading in the origin ports) until further notice:

View Article
https://www.ajot.com/images/uploads/article/don-davis_md_1.jpg
Inland Tank-Barge Safety Guide Second Edition, updated July 2026, released in five languages
View Article