Air Freight News

Refinery equipment from Greece transported to the Netherlands

Mar 04, 2024

Cosmatos Shipping Services, a member of the Worldwide Project Consortium (WWPC) for Greece, had their project cargo team coordinate the safe on time transport of six refinery devices from ex Works Thessaloniki to Liner in hook.

Cosmatos arranged the pick up of the over dimensioned pieces from site, transport to the port, port operations and documentation, as well as the condition survey for our Principals.

· 1 x Cooling water surge drum on saddles 10.9 x 4.1 x 3.76 m – 23.5 t

· 1 x Wet flare Ko drum on saddles 11.90 x 4.85 x 5.90 m – 65.2 t

· 1 x Isomerisation Gas / Liquid Separator on saddles 9.22 x 2.62 x 6.50 m – 42.5 t

· 2 x Ammonia Water Drum on saddles 10.8 x 3.8 x 4.2 m – 23 t

· 1 x Glycol Water Expansion Drum on saddles 7.5 x 2.8 x 4.42 m – 17.3 t

Similar Stories

https://www.ajot.com/images/uploads/article/Navigators-Shipping-and-Logistica%2C-the-Worldwide-Project-Consortium_truck-movement.jpg
Navigators move project shipments from the Middle East to Asia
View Article
https://www.ajot.com/images/uploads/article/Jim-Lange_UTC.jpg
Jim Lange is promoted to Vice President, Special Projects at UTC
View Article
https://www.ajot.com/images/uploads/article/BBC-Chartering-LakerMax-vessels-at-Duluth-SM.jpg
BBC Chartering LakerMax vessels mark back-to-back milestones at Port of Duluth-Superior
View Article
https://www.ajot.com/images/uploads/article/CMT_testing.jpg
Fleet-wide roll out for CMT fuel and lube test kits increase as ship managers look to reduce costs
View Article
https://www.ajot.com/images/uploads/article/AAL_wind_turbine_blades.png
AAL reduces sailings and boost efficiency for King Rocks Wind Farm
View Article
https://www.ajot.com/images/uploads/article/Ocean_Infinity_operations_centeer.jpg
Offshore operations: Why small improvements no longer cut it?
View Article