Air Freight News

Further success with E-Flexers – Deltamarin signs design contracts for three RoPax ships

Aug 20, 2021

Deltamarin has signed design contracts with China Merchants Jinling shipyard (Weihai) for the complete basic and detail design packages of three RoPax vessels. These are the 10th, 11th and 12th Stena E-Flexer vessels for two different end clients.

Stena's E-Flexer class has been developed with a basic concept, but is flexible and adapted to customer needs, both commercially and technically. The concept combines cargo and passenger capabilities, and the vessels are substantially larger than today's standard ferries. The Stena E-Flexer class is at the forefront in terms of sustainability, and sets a new standard for emissions, costs and energy efficiency, as well as performance.

Vessel no. 10 will be chartered by a Canadian federal Crown corporation, Marine Atlantic, from Stena RoRo. The vessel will have a capacity of 1,100 persons and approximately 2,600 lane meters. It has LNG dual fuel engines and a battery hybrid solution to minimise emissions. The ship will enter service in eastern Canada between Newfoundland and Nova Scotia in 2024.

“We are pleased to continue the successful cooperation with Deltamarin. The collaboration between our two companies has always been smooth and we have been satisfied with the quality of work in these demanding projects. We look forward to working together and providing Stena RoRo with these modern and energy-efficient RoPax vessels” says Mei Zhong Hua, General Manager of CMJL shipyard.

“With Deltamarin, we have an ideal partner enabling us to very efficiently develop and present new concepts to our potential clients. Our relationship has been strong for decades and with the CMI shipyard as the third partner, we know we can deliver high end vessels in time for our demanding clients” continues Per Westling, Managing Director of Stena RoRo AB.

“We are extremely happy and proud to continue the strategic partnership with Stena RoRo and China Merchants Jinling shipyard. The new orders prove that Stena E-Flexer vessels are highly valued on the client side, and the design has proven to be best of its class. We look forward the cooperating with Stena RoRo and China Merchants Jinling shipyard (Weihai)” concludes Janne Uotila, Managing Director of Deltamarin.

Given the exceptional situation of the past two years, the contract is significant and strengthens Deltamarin’s workload. The design work will start immediately and be carried out mainly at Deltamarin’s offices in Finland. The work will be completed during 2022. 

Similar Stories

https://www.ajot.com/images/uploads/article/Support_grows_for_India%E2%80%99s_new_maritime_CCTV_rules.jpg
Xeneta weekly ocean container shipping market update - July 24 (week 30)
View Article
https://www.ajot.com/images/uploads/article/Damen_Shipyards_and_CMA_CGM.jpg
CMA CGM PSS – from the Mediterranean & North Africa to the Middle East Gulf & Red Sea
View Article
https://www.ajot.com/images/uploads/article/Inside_a_car_carrier.jpg
MOL develop and introduce the ‘Skater’ to streamline cargo handling on car carriers
View Article
https://www.ajot.com/images/uploads/article/Kelsey_Foster_Press_Release.jpg
We Work the Waterways expands leadership team with appointment of Foster as Deputy Director
View Article
CMA CGM PSS - from the Mediterranean to the Middle East and Red Sea (OOG cargo)

CMA CGM Peak Season Surcharge (PSS) rates applicable as from August 1st, 2026 (date of loading in the origin ports) until further notice:

View Article
https://www.ajot.com/images/uploads/article/don-davis_md_1.jpg
Inland Tank-Barge Safety Guide Second Edition, updated July 2026, released in five languages
View Article