Air Freight News

Boeing to Resume Commercial Airplanes Production in Puget Sound

Apr 17, 2020
  • Enhanced health and safety procedures for employees at facilities
  • Employees who can telecommute continue to work from home

Boeing  will resume all Commercial Airplanes production in a phased approach at its Puget Sound-region facilities next week, after suspending operations last month in response to the COVID-19 pandemic. At all of its sites, the company has taken extra precautions and instituted comprehensive procedures to keep people safe and fight the spread of COVID-19.

"The health and safety of our employees, their families and communities is our shared priority," said Stan Deal, president and CEO of Boeing Commercial Airplanes and senior executive in the Pacific Northwest. "This phased approach ensures we have a reliable supply base, our personal protective equipment is readily available and we have all of the necessary safety measures in place to resume essential work for our customers."

Approximately 27,000 people in the Puget Sound area will return to production of the 747, 767, 777 and 787 programs, supporting critical global transportation infrastructure, cargo services and national defense and security missions. The 737 program will resume working toward restarting production of the 737 MAX. Boeing South Carolina remains in a suspension of operations at this time. Earlier this week Boeing restarted mostly defense production operations in the region with approximately 2,500 people.

Employees in the Puget Sound for the 737, 747, 767 and 777 will return as early as third shift on April 20 with most returning to work by April 21.  Employees for the 787 program will return as early as third shift April 23, with most returning to work by April 24.

The company's practices reinforce enhanced cleaning, employee health and physical distancing in partnership with employees. Aligned with federal and state guidance, these practices include:

  • Staggered shift start times to reduce the flow of employees arriving and departing work
  • Visual controls such as floor markings and signage to create physical distance
  • Face coverings will be a requirement for employees at Boeing sites in Washington. Employees are strongly encouraged to bring in their own procedural mask or face covering; those who do not have a mask available will be provided with one.
  • Providing required personal protective equipment to employees working in areas where physical distancing cannot be maintained for an extended period
  • Asking employees to perform self-health checks before coming to work and to stay home if they are ill
  • Employee wellness checks at the beginning of every shift and voluntary temperature screening at many manufacturing locations
  • Contact tracing when an employee tests positive for COVID-19 to reduce risk to teammates
  • Continued virtual meetings and employees who can work from home will continue to do
  • Transportation and common areas adjusted for physical distancing
  • Hand-washing stations in high-traffic areas and additional cleaning supplies available

Enhanced measures will continue until conditions allow for a return to regular work and cleaning processes. Boeing will continue to monitor government guidance on COVID-19, assess impact on company operations and adjust plans as the situation evolves.

Similar Stories

https://www.ajot.com/images/uploads/article/Electra_NASA_AACES_concept.jpg
NASA selects Electra as awardee in AACES 2050 program
View Article
https://www.ajot.com/images/uploads/article/Glasgow_people_1.jpg
Glasgow Prestwick Airport and Chicago Rockford International Airport sign partnership
View Article
https://www.ajot.com/images/uploads/article/Traffic_Sheet_October_2024.jpg
October 2024: Passenger volumes hold steady at Frankfurt Airport
View Article
https://www.ajot.com/images/uploads/article/Agreement_signing_between_SW_AFEZCO_and_ICAO_at_COP29.png
Silk Way Alat Free Economic Zone Company and ICAO sign strategic agreement at COP29 for green airport and cargo village
View Article
https://www.ajot.com/images/uploads/article/cacc-cargolinx-operations-cairo.jpg
Hermes SaaS Ecosystem goes live at Cairo International Airport
View Article
https://www.ajot.com/images/uploads/article/Boeing_Avia_Solutions_Group.jpg
Avia Solutions Group orders up to 80 Boeing 737 MAX jets to gear up expansion
View Article