Air Freight News

VPRA selects construction partner for Long Bridge-South Package

8 hours ago

The Virginia Passenger Rail Authority (VPRA) today announced the selection of the Long Bridge Rail Partners - a joint venture comprised of Trumbull Corp., Fay, S&B USA Construction, and Wagman Heavy Civil, Inc. – as construction partner for the Long Bridge Project-South Package. VPRA separated the Long Bridge Project, a new two-track bridge across the Potomac River, into two procurements, a North Package and a South Package. The North Package was awarded to Skanska/Flatiron Joint Venture in December 2023.

“The selection of Long Bridge Rail Partners completes the team that will build the largest of our Transforming Rail in Virginia projects, which will significantly change the way Virginians travel,” said DJ Stadtler, Executive Director of VPRA. “Our efforts to provide Virginians with expanded passenger rail service would not be possible without the continued support of Governor Youngkin and Secretary of Transportation Miller. We thank them for their support in making our vision a reality.”

“Virginia’s investment in rail will benefit passengers as well as our freight partners up and down the east coast,” said Tiffany Robinson, Director of the Department of Rail and Public Transportation and Chair of the VPRA Board. “Long Bridge is vital to this expansion. We look forward to working with Long Bridge Rail Partners on this project which will reshape rail service in the Commonwealth.”

“The Long Bridge Rail Partners (Trumbull, Wagman, and Fay, S&B USA Construction) are excited to work with VPRA on such a challenging, transformative project for the Washington metropolitan area,” said Mark Gentile, President of Trumbull Corporation. “Together with designer STV, we offer extensive bridge, marine, and railway experience to design and build the best solution for VPRA and the region.”

Long Bridge – South Package

The Long Bridge Project encompasses a 1.8-mile railroad corridor between Arlington, Virginia and Washington, DC. The South Package will use the Design-Build method to build a new two-track railroad bridge across the Potomac River, a bicycle/pedestrian bridge as well as all associated infrastructure between Arlington and Washington, DC. In June, VPRA issued a Request for Qualifications (RFQ) to the qualified design-build teams for the south end of the project.

The selection of the Long Bridge Rail Partners moves the project to the next level as all players are now in place. The Long Bridge Rail Partners team will take the project through the final design phase, incorporating innovative alternative technical concepts, through construction with completion expected in 2030.

The Long Bridge-South Package includes construction from the Rosslyn Interlocking in Arlington, Virginia to the northern abutment of the New Long Bridge on the north side of Ohio Drive SW in East Potomac Park in the District.

The South Package includes:

  • Potomac River Bridge – A new two track rail crossing over the George Washington Memorial Parkway and the Potomac River.
  • Bicycle/Pedestrian Bridge – A new 16-foot wide bicycle and pedestrian crossing over the George Washington Memorial Parkway and the Potomac River. Dedicated solely to bicycles and pedestrians, this bridge will improve access and provide a safe crossing for those not in cars or on trains. The bridge will have connections at the Long Bridge Aquatic Center, the Mount Vernon Trail, and Ohio Drive SW.
  • Additional Infrastructure – New retaining walls and associated embankments will be built at the George Washington Parkway as well as a new fender system within the Potomac River Navigational Channel.

In October, VPRA joined officials including U.S. Secretary of Transportation Pete Buttigieg, U.S. Senators Tim Kaine and Mark Warner, as well as U.S. Representatives Gerry Connelly and Abigail Spanberger, for a groundbreaking ceremony for the $2.3 billion infrastructure improvement project. The new Long Bridge will be strategically placed between the existing Long Bridge and the Washington Metropolitan Area Transit Authority (WMATA) Yellow Line bridge and will relieve one of the worst rail traffic bottlenecks on the East Coast.

VPRA’s Partners

Expanding passenger rail throughout the Commonwealth would not be possible without a strong partnership with the District of Columbia. VPRA recognizes the vital role DC plays in finding a workable solution for our area’s traffic challenges.

"Mayor Muriel Bowser, along with The District Department of Transportation are thrilled to hear of the announcement of the selection of the construction partner for the Long Bridge-South Package, marking a significant milestone in advancing this transformative project," said DDOT Director Sharon Kershbaum. "The completion of the Long Bridge will greatly benefit Washingtonians and the entire region by enhancing connectivity, improving transportation options, and fostering economic growth. We are excited to collaborate with our Virginia Passenger Rail Authority partners to bring this vital infrastructure project to fruition."

VPRA continues to work closely with VRE to improve and expand its Fredericksburg and Manassas Line service. VRE’s support includes close to $200 million in contributions towards the TRV program.

“The award of the Long Bridge-South package puts VRE one step closer toward its transformation from a commuter rail service to a regional one,” said VRE CEO Rich Dalton. “When this bridge opens in 2030, VRE will be able to expand service on both of its lines to meet the growing needs of travelers in the region. And, due to the separation of freight and passenger trains, we will experience improvements in reliability. VRE is pleased to partner with VPRA on this and other TRV projects.”

Working with CSX to expand service throughout the Commonwealth, VPRA was able to purchase the railroad right-of-way which will make Long Bridge and other TRV projects possible.

“The Long Bridge Project will unlock the bottleneck in this congested corridor and provide enhanced service for CSX customers, as well as VRE and Amtrak passengers,” said Randy Marcus, Director of State Relations for Virginia, West Virginia, and D.C. at CSX. “CSX’s collaboration with the Commonwealth continues to deliver economic and transportation benefits to businesses and commuters in Virginia and across the region.”

Amtrak, which has served as the state’s operational partner since Virginia’s state-supported service began in 2009, is contributing $944 million to the TRV program. Rail improvements will benefit the network of Amtrak Virginia, long distance, and commuter services operating in the Commonwealth.

“We are happy with this significant development advancing the Long Bridge project to improve rail infrastructure in Virginia,” Amtrak Vice President Ray Lang said. “We are proud to partner with VPRA on the continued growth of passenger rail for travel between the Northeast and Southeast regions.”

Transforming Rail in Virginia

A national model for the expansion of state-supported passenger rail service, TRV is the Commonwealth’s $5 billion initiative to expand passenger rail service and give Virginian’s an alternative to the state’s ever-growing traffic problem. With VPRA leading the way, the Commonwealth is changing the future of rail transportation by acquiring railroad right-of-way, increasing rail capacity, and reworking passenger and freight operations to improve reliability and increase rail service.

Other partners who have helped bring TRV to fruition include:

  • Federal Railroad Administration (FRA)who supported Long Bridge with a $729 million grant through its Federal-State Partnership for Intercity Passenger Rail Program (FSP-National).
  • Virginia’s Congressional delegation, who supported program funding and VPRA grant applications to ensure funding for Long Bridge as well as all Phase 2 TRV projects.
  • The Virginia General Assembly, who through their 2020 enabling legislation, created VPRA and established the Commonwealth Transportation Fund that provides ongoing funding for VPRA’s TRV projects.

Through a combination of state & local dollars and federal grants, Long Bridge as well as all Phose 2 TRV projects, are currently fully-funded. Once Phase 2 is complete, VPRA will fund a total of 13 daily Amtrak Virginia roundtrips, up from the current eight, along four corridors between Washington, DC and Roanoke, Newport News, Norfolk, and Richmond with continuing service to points north including Baltimore, Philadelphia, New York City, and Boston.

Similar Stories

RPA Statement on Thomas Prendergast as CEO of the Gateway Development Commission

Regional Plan Association applauds the selection of Thomas Prendergast to be the new CEO of the Gateway Development Commission (GDC). Tom‘s experience delivering major capital projects, including the first phase…

View Article
CN launches new medium horsepower hybrid locomotive pilot project

CN has announced the launch of its new medium horsepower hybrid electric locomotive developed in collaboration with Knoxville Locomotive Works (KLW).

View Article
https://www.ajot.com/images/uploads/article/Producer_Price_Index_for_Freight_Transportation_Services_January_2019_-_December_2024.png
Transportation Producer Price Index – December 2024
View Article
https://www.ajot.com/images/uploads/article/NRLC.png
SMART-MD members vote to ratify national agreement with NCCC
View Article
https://www.ajot.com/images/uploads/article/AAR.jpg
AAR reports rail traffic for the week ending January 11, 2025
View Article
Intermodal industry supports confirmation of the Duffy as US Secretary of Transportation

Tomorrow, the United States Senate will be holding a confirmation hearing for the Honorable Sean Duffy, former Congressman representing Wisconsin’s 7th District, to be the 20th United States Secretary of…

View Article