Air Freight News

Port of Antwerp-Bruges: Certified pick up phased live from 15 January

Jan 12, 2024

After consultation with terminals, ship agents, transport companies, and other stakeholders, it was jointly decided to move to a phased roll-out of Certified Pick up, to spread the pressure for the users and to guarantee the performance of the system. Some shipping agents are switching to container pick-up via CPu at certain terminals, as planned, on 15 January. Others will follow shortly after.

The exceptional rush on the platform in recent days led to the elaboration of a phased approach. From 15 January, part of the container volumes will have to be collected via Certified pickup as planned. For the shipping company/terminal combinations for which CPu is not yet live, the transport company must follow the shipping agent and terminal's guidelines.

The next phases in this launch will follow soon and will be announced via the news section of certifiedpickup.eu.

It remains very important that all parties involved register on the Cpu platform as soon as possible. First Release Parties (forwarder, consignee or cargo stakeholder) must accept containers and pass on the release right. Transport Operators must accept the release right and link the truck driver's Alfapass or company identity to the containers. Customs must also give the green light. The container can then be picked up based on (company) identity.

General overview of shipping agents/terminals

Story image

Note: indicative timings regarding phase 2 and 3

Similar Stories

https://www.ajot.com/images/uploads/article/_ADN6652.jpg
APSEZ expands partnership with US-based Kaleris to accelerate AI-led transformation
View Article
https://www.ajot.com/images/uploads/article/Seroka_Port-of-Los-Angeles_Insight.jpg
Port Los Angeles throughput jumps 17% in May
View Article
https://www.ajot.com/images/uploads/article/Maersk%E2%80%99s_PH6_service_kicked_off_at_Visayas_Container_Terminal_with_the_arrival_of_the_Maersk_Bahamas..jpg
Visayas Container Terminal expands global connectivity with Maersk PH6 service
View Article
https://www.ajot.com/images/uploads/article/PD_Ports_strengthens_bulk_handling_capacity_at_Teesport_with_%C2%A35.4m_crane_investment_.jpg
PD Ports strengthens bulk handling capacity at Teesport with £5.4m crane investment
View Article
https://www.ajot.com/images/uploads/article/Enstructure-to-Acquire-LOGISTEC-Marine-Terminal.jpg
Enstructure to acquire Logistec Marine Terminal Division
View Article
https://www.ajot.com/images/uploads/article/kalmar-electric-reachstackers.jpg
Kalmar and Steinweg extend partnership with new order for electric reachstackers
View Article