Air Freight News

MOL concludes charter agreement for LNG carrier with TotalEnergies

Oct 20, 2022

Mitsui O.S.K. Lines, Ltd. announced that it has signed a multi-year contract to charter a newbuild LNG Carrier with TotalEnergies Gas & Power Limited, who is wholly owned subsidiary of TotalEnergies on September 26th.

The vessel currently being built by Daewoo Shipbuilding & Marine Engineering is fitted with the most modern ME-GA engine which provides lower emissions compared to previous generation vessels. ME-GA engine is equipped with Exhaust Gas Recirculation (EGR) system that reduces methane slip while improving overall fuel consumption. The vessel will have cargo tank capacity of 174,000 m3 and the size of the vessel is suitable to operate globally serving the main LNG terminals around the world.

The vessel will be delivered in 2025 to serve TotalEnergies LNG portfolio and shall continue to improve the environmental performance of its LNG carrier fleet.

Similar Stories

https://www.ajot.com/images/uploads/article/Offshore.jpg
Trump administration lifts pause on wind energy permitting but buys out one more developer
View Article
https://www.ajot.com/images/uploads/article/Support_grows_for_India%E2%80%99s_new_maritime_CCTV_rules.jpg
Maritime security becomes a strategic factor
View Article
https://www.ajot.com/images/uploads/article/Vessels-at-the-Strait-of-Hormuz.jpg
WSC statement on agreement to reopen Strait of Hormuz
View Article
https://www.ajot.com/images/uploads/article/TIE06182026.jpg
Today in energy: Permian natural gas production increased faster than crude oil
View Article
https://www.ajot.com/images/uploads/article/Maritime_Container-Ship.jpg
Braemar joins the Sustainable Shipping Initiative
View Article
https://www.ajot.com/images/uploads/article/Maersk_Gothenburg.png
CORE POWER, Maersk, LR and the Port of Rotterdam publish study on port calls for nuclear ships
View Article