Air Freight News

MB92 La Ciotat reaches major milestone ahead of September shiplift delivery

Mar 18, 2022

Lifting platform moved into position in complex engineering manoeuvre

MB92 La Ciotat, France’s leading superyacht refit shipyard, announced today that a major milestone has been reached in the construction of the platform, maintaining the shipyard’s schedule for the opening of the facility as planned this autumn for yachts up to 115-metres in length.

Following the delivery last summer of the main elements of the structure and 9 months of engineering work on site, the Matière-Bardex team have now completed the complex task of assembling and moving the lifting platform to its final position. At 100 metres in length, equivalent to a football pitch, and 20 metres wide, the platform weighs 1,100 tonnes and required a team of 20 people and 3 hours to carry out the exceptional manoeuvre of moving the shiplift structure and 2 days for the final installation in the concrete recess.

The innovative Bardex lifting system which includes 20 chain jacks is now being installed, and features a hydraulic ram and chain system expressly designed to increase safety and reduce maintenance.

Mathieu Bauden, MB92 La Ciotat Facilities Director, has been overseeing the project since its inception end of 2018 and said: “This is a key stage in the delivery of the 4300t platform which leaves us well positioned as we enter the final six months of the project. The next important steps are the delivery of the control building, the installation of all energy networks, reception of the transfer system, the cradles and final testing followed by certification by Lloyds this summer.”

Vincent Escallier, Commercial Director of MB92 La Ciotat added: “We are all looking forward to the imminent opening of our new facility and this latest accomplishment brings us one step closer. It’s an extraordinary piece of infrastructure that complements the wide range of lifting options available to clients of our shipyard.”

Similar Stories

https://www.ajot.com/images/uploads/article/Descartes_1_2.png
Descartes Global Shipping Report: May U.S. imports climb as risks linger
View Article
Gulftainer unveils 150-hectare regional powerhouse ‘Al Dhaid Multi-Modal Trade Corridor’

Gulftainer (GT) has unveiled its strategic plans to develop the Al Dhaid Multi-Modal Trade Corridor—a landmark 150-hectare regional powerhouse with annual capacity of 1.5 million TEUs.

View Article
https://www.ajot.com/images/uploads/article/Delfin_Midstream.png
DOT celebrates historic $5 billion investment in nation’s first waterborne LNG export facility
View Article
https://www.ajot.com/images/uploads/article/Freedom_Intermodal_Tank_Services.jpg
Freedom Intermodal expands advanced bulk liquid packaging facility in New Orleans, enhancing regional supply chain capabilities
View Article
https://www.ajot.com/images/uploads/article/byc_june_drayage_index.png_copy_.png
The National Drayage Spot Market Index has increased by 9.2% YOY
View Article
https://www.ajot.com/images/uploads/article/Dr._Noel_Hacegaba_and_Robert_Loya_.jpg
Zero-emissions truck early adopters awarded almost $5 million at the Port of Long Beach
View Article