Air Freight News

Cadeler signs firm contracts with ScottishPower Renewables for East Anglia TWO foundation and turbine T&I

about 6 hours ago

Cadeler today announces the signing of firm contracts for the transportation and installation of 64 x 15MW offshore wind turbine generators (“WTGs”) as well as the foundations for the East Anglia TWO Offshore Wind Farm, being developed by ScottishPower Renewables (a member of the Iberdrola Group) off the coast of the UK. The aggregate value of these contracts to Cadeler is projected to fall within the range of EUR 360 – 382 million. The offshore works are set to commence in 2027 and will see the use of one of Cadeler’s newbuild A-class vessels.

In September 2024, the UK government announced the results of its latest auction for the award of contracts critical to the outbuild of new offshore wind farms. The awards included 960MW capacity allocated to ScottishPower Renewables’ £4 billion East Anglia TWO Offshore Wind Farm. East Anglia TWO will be located in the southern region of the North Sea, off the East Coast of England, and is expected to feature 64 x 15MW turbines, with the capacity to power the equivalent of almost one million homes each year.

Strong position in the foundations space

Cadeler will be responsible for the transportation and installation of both the foundations and the WTGs for East Anglia TWO. The project will see the use of one of Cadeler’s A-class newbuild vessels, together with an O-class vessel from Cadeler’s existing fleet. This combination demonstrates Cadeler’s fleet flexibility and its ability to maximize efficiency and synergies across vessel classes.

Mikkel Gleerup, CEO of Cadeler, said: “This project underlines that our strategic decisions are in sync with our customers’ needs and the demands that we see in the market. With our six newbuilds on their way, Cadeler will deliver even greater flexibility and offer still improved efficiency for our clients, with solutions for even more complex projects. The East Anglia TWO project reinforces Cadeler’s strong position as a full-service T&I provider in the foundations space and our pivotal role in driving the transition to renewable offshore wind energy”.

Cadeler’s partnership with ScottishPower Renewables on East Anglia TWO, announced today, reflects the execution of firm contracts for a portion of the work contemplated by a reservation agreement Cadeler disclosed in May 2024.

Encouraging auction round

The offshore installation work for East Anglia TWO is set to commence in 2027 and, when finalised, the wind farm has the potential to make a substantial contribution to the UK government’s 2030 clean energy targets.

Mikkel Gleerup, CEO of Cadeler, said: “The results of the UK government’s Auction Round 6 are encouraging a focus on continued investment and further commitments to the green transition, with offshore wind energy set to play a crucial role in the energy mix of tomorrow.”

Charlie Jordan, ScottishPower Renewables CEO, said: “Following our recent auction success, we’ve been moving with pace and purpose to confirm the supply chain for East Anglia TWO, so it’s great to have Cadeler on board supporting this vital clean energy project, which will power almost one million homes with green electricity.

East Anglia is the heart of our offshore wind operations in the UK and a vitally important region for us with one operational wind farm, another under construction and the supply chain now being confirmed for our third, enabling us to get out there and deliver a cleaner, greener and better future, quicker.”

Similar Stories

https://www.ajot.com/images/uploads/article/PIL_9000_TEU_LNG_dual-fuel_container_vessel.jpeg
PIL accelerates fleet renewal with order for five more LNG dual-fuel vessels
View Article
https://www.ajot.com/images/uploads/article/Brent_field_decommissioning_project.jpg
Final topside load-in completed for Brent field decommissioning project
View Article
https://www.ajot.com/images/uploads/article/EIA_chart_19_9.jpg
U.S. summer nuclear outages declined in 2024, returning to 2022 levels
View Article
https://www.ajot.com/images/uploads/article/Chevon_SA.jpeg
Chevron expands supply of marine lubricants to include Port Elizabeth, South Africa
View Article
https://www.ajot.com/images/uploads/article/computer_screen.jpeg
Don’t EU worry. Compliance without the complexity
View Article
https://www.ajot.com/images/uploads/article/EIA_chart_14_9.jpg
U.S. exports of ethane and ethane-based petrochemicals rose 135% from 2014 to 2023
View Article