Air Freight News

Berlin’s cold war-era Tegel Airport to close next month

Berlin’s Tegel airport can halt operations next month after the coronavirus virtually stopped traffic there, in what could spell the end for the Cold War-era facility.

Due to shutter for good in November, Tegel can temporarily close from June 15 after shareholders agreed that keeping it open isn’t economical, Eva Henkel, a spokeswoman for Berlin’s finance ministry, said Wednesday. Traffic plummeted by about 95% last month.

Flights will be handled instead at Schoenefeld to the south-east of the city until the long-delayed BER airport—located at the same site—opens at the end of October.

Tegel’s hexagon-shaped terminal was completed in the 1970s when Berlin was an island in a sea of communism. Designed for a fraction of the 36 million passengers it handled last year, the airport has been popular with travelers for its conveniently small size and proximity to the city center.

Critics say it’s cramped and out of date. Arrivals and departures are mostly handled on the same level, and there’s only rudimentary retail space and no rail connection to the center.

Tegel, which is named after German aviation pioneer Otto Lilienthal, will be the second airport to close in Berlin in recent years after the 2008 shutdown of Tempelhof, the historic facility where Allied planes landed during the Berlin Airlift.

The Tegel site is due to be redeveloped into a technology park and university.

Bloomberg
Bloomberg

© Bloomberg
The author’s opinion are not necessarily the opinions of the American Journal of Transportation (AJOT).

Similar Stories

https://www.ajot.com/images/uploads/article/FreightWeekSTL-MaryLamieInterviewWithTimLuchini.jpg
Reimagining rail: Innovation  on  track with Intramotev
View Article
https://www.ajot.com/images/uploads/article/tsi-infographic-apr26_crop.png
April 2026 Freight TSI rose 0.3% from March 2026 and rose 1.4% from April 2025
View Article
Gulftainer unveils 150-hectare regional powerhouse ‘Al Dhaid Multi-Modal Trade Corridor’

Gulftainer (GT) has unveiled its strategic plans to develop the Al Dhaid Multi-Modal Trade Corridor—a landmark 150-hectare regional powerhouse with annual capacity of 1.5 million TEUs.

View Article
https://www.ajot.com/images/uploads/article/AARailroad.jpeg
AAR reports rail traffic for the week ending June 06, 2026
View Article
https://www.ajot.com/images/uploads/article/DSV.png
DSV launches direct Luxembourg–Indianapolis pharma air route
View Article
https://www.ajot.com/images/uploads/article/Aviator-Airport-Alliance-Icelandair-ground-handling.jpg
Aviator Airport Alliance signs ground handling and de-icing agreement with Icelandair in Norway
View Article